asf0531
asf0531Beach CrabBlue Mountain Beach2 postsJoined View profileMessageBeach Crab
1,032 views
How is construction going on this? Is the bike lane still open? Will be down in March and hate that we will have to go 98 to Grayton.
Replies
4bob bob
bob bobBeach FanaticSRB890 postsJoined View profileMessageBeach Fanatic
I haven't eyeballed it lately but guessing it's only half way there.
Will B
Will BModeratorAtlanta, GA4,582 postsJoined View profileMessageModerator
I'd be interested in the timeline. As usual, the Seaside half marathon plans on heading right down 30A. They buttoned up the last bridge they replaced right before the race. Assuming there will be the same push or a plan B by the race organizers.
Jimmy T
Jimmy TBeach Fanatic934 postsJoined View profileMessageBeach Fanatic
Bike path is still closed. The bridge decking is down and they are working on the road leading up to the bridge. I heard they were supposed to be done by the end of the month.
bob bob
bob bobBeach FanaticSRB890 postsJoined View profileMessageBeach Fanatic
Bike path is still closed. The bridge decking is down and they are working on the road leading up to the bridge. I heard they were supposed to be done by the end of the month.Thanks! I was way off lol.
Checking your forum account
Please wait while we verify your forum account.